|
|
(35 intermediate revisions by 4 users not shown) |
Line 15: |
Line 15: |
| | | |
| [https://dokumente.ub.tu-clausthal.de/servlets/MCRFileNodeServlet/Document_derivate_00000154/Db112168.pdf PhD Thesis of Jessica Rövekamp] contains German data | | [https://dokumente.ub.tu-clausthal.de/servlets/MCRFileNodeServlet/Document_derivate_00000154/Db112168.pdf PhD Thesis of Jessica Rövekamp] contains German data |
| + | |
| + | [[SciGRID gas|SciGrid_gas Transmission Network Data Model]]<br/> |
| | | |
| <br/> | | <br/> |
| | | |
| <br/> | | <br/> |
− |
| |
− | == Europe<br/> ==
| |
| | | |
| <br/> | | <br/> |
| + | |
| + | == Europe<br/> == |
| | | |
| === Natural Gas Demand === | | === Natural Gas Demand === |
| | | |
− | ToDo
| + | Consumption of EU countries: [https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/Annex C.zip https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/Annex C.zip] |
| + | |
| + | SciGRID_gas: Consumption of EU (Nuts1, Nut2 and Nuts3): [https://doi.org/10.5281/zenodo.4922515 https://doi.org/10.5281/zenodo.4922515] |
| | | |
| === Natural Gas Supply === | | === Natural Gas Supply === |
| | | |
− | ToDo
| + | Production of EU countries: [https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/Annex C.zip https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/Annex C.zip] |
| | | |
| <br/> | | <br/> |
Line 42: |
Line 46: |
| [http://www.vge.de/wandkarten.aspx VGE European and German gas maps] | | [http://www.vge.de/wandkarten.aspx VGE European and German gas maps] |
| | | |
− | ==== Pipelines ==== | + | [http://www.topandtail.org.uk/publications/O.Ogunbunmi.pdf Simplification of the European Gas Network] by Cardiff University (Data only on PDF) |
| + | |
| + | [[SciGRID gas|SciGrid_gas Transmission Network Data Model]]<br/> |
| + | |
| + | |
| + | |
| + | |
| + | |
| + | ==== Pipelines<br/> ==== |
| + | |
| + | Capacities in Europe: [https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/entsog_tyndp_2017_Annex_D_Capacities.xlsx https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/entsog_tyndp_2017_Annex_D_Capacities.xlsx]<br/> |
| + | |
| + | [https://pypi.org/project/osmscigrid/ SciGRID_gas OpenStreetMap pipelines] |
| + | |
| + | [[SciGRID gas|SciGrid_gas transmission data model]] |
| | | |
− | ToDo
| |
| | | |
| ==== LNG ==== | | ==== LNG ==== |
| | | |
− | ToDo
| + | Capacities in Europe: [https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/entsog_tyndp_2017_Annex_D_Capacities.xlsx https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/entsog_tyndp_2017_Annex_D_Capacities.xlsx]<br/> |
| + | |
| + | [[SciGRID gas|SciGrid_gas Transmission Network Data Model]] |
| + | |
| | | |
| ==== Storages ==== | | ==== Storages ==== |
| | | |
− | ToDo
| + | [https://agsi.gie.eu/#/ Live data on capacities in Europe] |
| | | |
− | <br/>
| + | Capacities in Europe: [https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/entsog_tyndp_2017_Annex_D_Capacities.xlsx https://www.entsog.eu/public/uploads/files/publications/TYNDP/2017/entsog_tyndp_2017_Annex_D_Capacities.xlsx] |
| | | |
− | <br/>
| + | [[SciGRID gas|SciGrid_gas Transmission Network Data Model]] |
| | | |
| <br/> | | <br/> |
Line 78: |
Line 98: |
| <br/> | | <br/> |
| | | |
| + | <br/> |
| | | |
| = List of Gas Models = | | = List of Gas Models = |
| | | |
− | *COLUMBUS | + | *COLUMBUS<ref>COLUMBUS http://www.ewi.research-scenarios.de/de/modelle/columbus/</ref> |
− | *EUGAS | + | *EUGAS<ref>EUGAS http://www.ewi.uni-koeln.de/fileadmin/user_upload/Publikationen/Working_Paper/EWI_WP_05-01_Forecasting-European-Gas-Supply.pdf</ref> |
| *[[GAMAMOD|GAMAMOD]] | | *[[GAMAMOD|GAMAMOD]] |
− | *GAMMES | + | *GAMAMOD-DE |
− | *GASMOD | + | *GaMMES<ref>GaMMES http://www.cgemp.dauphine.fr/fileadmin/mediatheque/centres/cgemp/conference%20programmes/Massol_et_al._2013.pdf</ref> |
− | *GASTALE | + | *GASMOD<ref>GASMOD http://www.diw.de/sixcms/detail.php?id=diw_02.c.231874.de</ref> |
− | *GGM (Global Gas Model) | + | *GASTALE<ref>GASTALE https://www.ecn.nl/publications/PdfFetch.aspx?nr=ECN-R--03-001</ref> |
| + | *GGM (Global Gas Model)<ref>GGM https://www.diw.de/documents/publikationen/73/diw_01.c.417156.de/dp1273.pdf</ref> |
| *MAGELAN | | *MAGELAN |
| + | *MYNTS-Gas <ref name="https://www.scai.fraunhofer.de/content/dam/scai/de/documents/Mediathek/Produktblaetter/HPA_MYNTS_OptimiertTransportnetzeFuerElektrizitaet_GasUndWasser.pdf">MYTNS Model https://www.scai.fraunhofer.de/content/dam/scai/de/documents/Mediathek/Produktblaetter/HPA_MYNTS_OptimiertTransportnetzeFuerElektrizitaet_GasUndWasser.pdf</ref> |
| *NATGAS | | *NATGAS |
| *S-GASTALE | | *S-GASTALE |
| + | *[[SciGRID gas|SciGRID_gas]] |
| *TIGER | | *TIGER |
− | *WGM (The World Gas Model) | + | *WGM (The World Gas Model)<ref>WGM https://www.diw.de/sixcms/detail.php?id=diw_01.c.358051.de</ref> |
| + | *[https://github.com/lanl-ansi/GasModels.jl GasModels.jl] in Julia |
| | | |
| + | <br/> |
| + | |
| + | <br/> |
| + | |
| + | <br/> |
| | | |
| = Publications<br/> = | | = Publications<br/> = |
Line 118: |
Line 148: |
| == Coupling gas-electricity<br/> == | | == Coupling gas-electricity<br/> == |
| | | |
− | *<references />Abrell, J., Gerbaulet, C., Holz, F., Lorenz, C., and Weigt, H. [http://www.diw.de/documents/publikationen/73/diw_01.c.425843.de/dp1317.pdf Combining Energy Networks The Impact of Europe's Natural Gas Network on Electricity Markets until 2050], 2013 DIW Working Paper<br/> | + | *Abrell, J., Gerbaulet, C., Holz, F., Lorenz, C., and Weigt, H. [http://www.diw.de/documents/publikationen/73/diw_01.c.425843.de/dp1317.pdf Combining Energy Networks The Impact of Europe's Natural Gas Network on Electricity Markets until 2050], 2013 DIW Working Paper<br/> |
− | *<references />Abrell, J., Weigt, H. [https://wwz.unibas.ch/uploads/tx_x4epublication/Combined_dynamic_Abrell_Weigt_2014.05.pdf Investments in a Combined Energy Network Model: Substitution between Natural Gas and Electricity] WWZ Discussion Paper 2014/05<br/> | + | *Abrell, J., Weigt, H. [https://wwz.unibas.ch/uploads/tx_x4epublication/Combined_dynamic_Abrell_Weigt_2014.05.pdf Investments in a Combined Energy Network Model: Substitution between Natural Gas and Electricity] WWZ Discussion Paper 2014/05<br/> |
− | *<references />Arnold, M. and Andersson, G. [https://www.eeh.ee.ethz.ch/uploads/tx_ethpublications/Arnold_DecomposedElectricityandNaturalGasOPF.pdf Decomposed Electricity and Natural Gas Optimal Power]<br/> | + | *Arnold, M. and Andersson, G. [https://www.eeh.ee.ethz.ch/uploads/tx_ethpublications/Arnold_DecomposedElectricityandNaturalGasOPF.pdf Decomposed Electricity and Natural Gas Optimal Power]<br/> |
− | *<references />Hürrenrauch et al. (2017)<br/> | + | *Hürrenrauch et al. (2017)<br/> |
− | *<references />McCalley, J. (2015) [http://iiesi.org/assets/pdfs/iiesi_102_mccalley1.pdf Integrated Energy System: Co-optimization & Design Issues (Presentation)]<br/> | + | *McCalley, J. (2015) [http://iiesi.org/assets/pdfs/iiesi_102_mccalley1.pdf Integrated Energy System: Co-optimization & Design Issues (Presentation)]<br/> |
− | *<references />McCalley, J. (2015) [http://iiesi.org/assets/pdfs/101_mccalley_2.pdf Gas-Electricity Nexus (Presentation)] | + | *McCalley, J. (2015) [http://iiesi.org/assets/pdfs/101_mccalley_2.pdf Gas-Electricity Nexus (Presentation)] |
| + | |
| + | <br/> |
| + | |
| + | = References<br/> = |
| + | |
| + | <references /> |
| | | |
| <br/><br/> | | <br/><br/> |
Here datasets and modelling issues for the long-distance transport of natural gas are listed.
Compressibility, line pack (i.e. storage inside pipes), gas consumption of compressors, daily modelling, Gross Calorific Value (GCV), storage, LNG transport
Compressors are needed to maintain pressure throughout the network. They are typically stationed every 90 km to 150 km in the long-distance network, sometimes up to every 400 km for international routes [Rövekamp]. Onshore long-distance pipelines have a diameter of 0.4 to 1.4 meters and pressures up to 100 bar [Rövekamp]. The compressors can consume up to 5-10% of the transported gas (0.3% per 150 km? citation needed).
It's apparently hard to measure exactly what is flowing at any one time in the network; often only daily flows are modelled or reported.
where sgn(p_m,p_n) =1 if p_m \geq p_n and sgn(p_m,p_n) = -1 if p_m < p_n.