|
|
Line 24: |
Line 24: |
| | | |
| | | |
− | == Milestone 1 (deadline: 31 August 2015) == | + | |
| + | == Milestone 1 (deadline: 31 August 2015)<br/> == |
| | | |
| '''General points''' | | '''General points''' |
| | | |
| *We support the idea of a register<br/> | | *We support the idea of a register<br/> |
− | *Should be published under an open license. '''(suggesting ODbL? [1]''' | + | *We support the idea to establish a new numbering system as proposed, where each identifier starts with 3 characters for the market player, power plant, transmission grid operator etc. and followed by 10 digits plus a last check digit (according to the EAN (European Article Number))<br/> |
− | *The register should “think” European, be compatible with existing registers elsewhere.'''Do we have specific examples? (ORISPL - Office of Regulatory Information System Plant Location (US)'''''')'' | + | *We support the idea to link already existing numbering schemes (e.g. identifiers of the "Kraftwerksliste") to the new numbering system<br/> |
| + | *Should be published under an open license. '''(suggesting ODbL? [1])'''<br/> |
| + | *The register should “think” European by adding country code using ISO 3166-1 alpha 2 - two letters - at the beginning [2]. <br/> |
| + | *Register can be similar to ORISPL - Office of Regulatory Information System Plant Location (US) '''(TODO: Add a Link for further information)'''<br/> |
| | | |
| <br/> | | <br/> |
Line 36: |
Line 40: |
| '''Specific points''' | | '''Specific points''' |
| <div> | | <div> |
− | *<span style="font-size: 13.6000003814697px; line-height: 1.5em;">the coverage of the data should become clear (e.g., "X% of all capacity is included; most missing capacity is small-scale gas-fired plants")</span><br/> | + | *<span style="line-height: 1.5em; font-size: 13.6px;">the coverage of the data should become clear (e.g., "X% of all capacity is included; most missing capacity is small-scale gas-fired plants")</span><br/> |
| *There are > 800k PV installations - will these be included? | | *There are > 800k PV installations - will these be included? |
| *Does Stromerzeugungsanlagen (EAS) distinguish between generators and boilers?<br/> | | *Does Stromerzeugungsanlagen (EAS) distinguish between generators and boilers?<br/> |
Line 51: |
Line 55: |
| ***Best longitude and latitude, Ok adress data<br/> | | ***Best longitude and latitude, Ok adress data<br/> |
| ***Anonymisation of very small (private) EAS => assignment to (unique) grid conection point / local grid ?<br/> | | ***Anonymisation of very small (private) EAS => assignment to (unique) grid conection point / local grid ?<br/> |
− | ***Why not include time-series or annual generation data? | + | ***Why not include time-series or annual generation data?<br/> |
| ***...<br/> | | ***...<br/> |
| *** | | *** |
| </div> | | </div> |
− | <br/>It might be useful to suggest collecting use cases for the data to help ensure that what is being gathered can help to answer real research problems. | + | <br/>It might be useful to suggest collecting use cases for the data to help ensure that what is being gathered can help to answer real research problems.<br/> |
− | | + | |
− | <br/>[1] [http://opendatacommons.org/licenses/odbl/ http://opendatacommons.org/licenses/odbl/] (also used by OpenStreetMap) | + | |
| | | |
| <br/> | | <br/> |
| + | |
| + | [1] [http://opendatacommons.org/licenses/odbl/ http://opendatacommons.org/licenses/odbl/] (also used by OpenStreetMap)<br/> |
| + | |
| + | [2] [https://en.wikipedia.org/wiki/ISO_3166-1_alpha-2 https://en.wikipedia.org/wiki/ISO_3166-1_alpha-2]<br/><br/> |
| | | |
| <br/> | | <br/> |
| + | |
| | | |
| == Milestone 2 (deadline: 31 October 2015) == | | == Milestone 2 (deadline: 31 October 2015) == |
Germany (BMWi, BNetzA) plans to to develop a register of power plant data that covers all plants (“starting from 0 kW”) that supersedes the current “EEG Stammdatenbank” and the “BNetzA Kraftwerksliste”.
There is a three-step consultation process with three deadlines ("milestones"). Openmod-i plans to submitt comments and recommendations in each of the steps.