EnergyScope |
true |
false |
Apache License 2.0 (Apache-2.0) |
|
Regional energy system design |
dispatch investment |
Region (Switzerland, Belgium) |
Optimization |
|
GLPK/GLPSOL or AMPL/Cplex |
Ficus |
true |
true |
GNU General Public License version 3.0 (GPL-3.0) |
|
energy system optimization model |
dispatch investment |
|
Optimization |
None |
Python (Pyomo) |
FlexiGIS |
true |
false |
BSD 3-Clause "New" or "Revised" License (BSD-3-Clause) |
distribution |
urban energy systems |
|
|
Optimization Simulation |
|
Python |
GAMAMOD |
false |
true |
|
transmission distribution |
European Natural Gas Market |
dispatch investment |
|
Optimization |
|
GAMS |
GAMAMOD-DE |
false |
true |
|
|
|
dispatch |
|
|
|
GAMS; CPLEX |
GRIMSEL-FLEX |
true |
false |
BSD 2-Clause "Simplified" or "FreeBSD" License (BSD-2-Clause) |
transmission net transfer capacities |
Energy System Model Optimization Social Planner |
dispatch |
Switzerland, Austria, Italy, France, Germany |
Optimization |
Perfect foresight, Sensitivity analisys, Scenarios |
Python (Pyomo) |
Genesys |
true |
false |
GNU Library or "Lesser" General Public License version 2.1 (LGPL-2.1) |
transmission net transfer capacities |
Electricity System Model |
dispatch investment |
Europe, North Africa, Middle East |
Optimization Simulation |
24 h foresight for storage operation |
C++, boost library, MySQL and QT4, (optional CPLEX solver implementation) |
GridCal |
true |
true |
GNU General Public License version 3.0 (GPL-3.0) |
transmission distribution AC load flow DC load flow |
Transmission Network Model and Data (input and output) |
|
|
Optimization Simulation |
Deterministic, stochastic |
Python |
HighRES |
true |
false |
MIT license (MIT) |
transmission net transfer capacities |
European electricity system model GB electricity system model |
dispatch investment |
EEA+Norway and UK |
Optimization |
|
GAMS; CPLEX |
IRENA FlexTool |
true |
false |
GNU Library or "Lesser" General Public License version 3.0 (LGPL-3.0) |
transmission net transfer capacities |
Multi-purpose |
dispatch investment |
User dependent |
Optimization |
perfect foresight, but can use limited horizon |
GNU MathProg |
JMM |
false |
false |
|
|
|
|
|
|
|
|
Lemlab |
true |
false |
GNU General Public License version 3.0 (GPL-3.0) |
|
agent-based simulation |
|
|
Simulation Agent-based |
perfect forecast, deterministic, stochastic |
Python, Pyomo |
LoadProfileGenerator |
true |
false |
MIT license (MIT) |
|
|
|
|
|
|
C# |
MEDEAS |
true |
false |
MIT license (MIT) |
|
|
|
Global; European Union; Bulgaria; Austria |
Other |
Deterministic |
Phyton |
MOCES |
false |
true |
|
|
Energy Modeling Framework |
dispatch |
Depends on user |
Simulation Agent-based |
deterministic, stochastic |
Modelica, Dymola, (OpenModelica), C++, MySQL, SQLite |
Maon |
false |
false |
|
transmission distribution AC load flow DC load flow net transfer capacities |
Mixed-Integer Quadratic Programming (MIQP) |
dispatch investment |
Europe, North Africa, Middle East |
Optimization Simulation Other Agent-based |
Monte Carlo, preprocessing or sensitivity |
C++ |
Medea |
true |
false |
MIT license (MIT) |
net transfer capacities |
Austrian and German electricity market |
dispatch investment |
Austria, Germany |
Optimization |
Deterministic |
GAMS |
MicroGridsPy |
true |
false |
European Union Public Licence Version 1.1 (EUPL-1.1) |
|
Energy Modeling Framework |
dispatch investment |
|
Optimization |
Two-stage stochastic optimization |
Python (Pyomo) |
Mosaik |
true |
false |
GNU Library or "Lesser" General Public License version 2.1 (LGPL-2.1) |
transmission distribution |
distributed energy systems smart grid simulation |
|
|
Optimization Simulation Agent-based |
|
Python |
MultiMod |
false |
true |
|
transmission net transfer capacities |
Equilibrium model |
dispatch investment |
Global |
Other |
Not covered (yet) |
GAMS |