|
|
| Line 46: |
Line 46: |
| | |computation_time_minutes=1500 | | |computation_time_minutes=1500 |
| | |computation_time_comments=backcasting 2018 with detailed hydro, CHP, DSR and FBMC model in hourly resolution with all ENTSO-E bidding zones | | |computation_time_comments=backcasting 2018 with detailed hydro, CHP, DSR and FBMC model in hourly resolution with all ENTSO-E bidding zones |
| − | |citation_references=Ketov, Mihail (2019). "Marktsimulationen unter Berücksichtigung der Strom-Wärme-Sektorenkopplung", Print Production, volume 189, PhD thesis, RWTH Aachen University. | + | |citation_references=Ketov, Mihail (2019). "Marktsimulationen unter Berücksichtigung der Strom-Wärme-Sektorenkopplung", Print Production, Aachener Beiträge zur Energieversorgung, volume 189, PhD thesis, RWTH Aachen University. |
| | |Model input file format=No | | |Model input file format=No |
| | |Model file format=No | | |Model file format=No |
| | |Model output file format=No | | |Model output file format=No |
| | }} | | }} |
Revision as of 07:36, 16 September 2019
|
Maon
by Maon GmbH
Authors: Mihail Ketov, Fabian Pfannes, Huangluolun Zhou, Dariush Wahdany, Nicolai Schmid
Contact: Dr.-Ing. Mihail Ketov
|
Based on C++. Using Kubernetes, MinIO, MongoDB, Preact, Node.js, GraphQL, Python, WebAssembly, GCC, cURL, OpenMPI for data processing.
Website / Documentation
|
Not Open Source
Not directly downloadable
No data shipped
Not planned to open up further in the future
|
| Model Scope |
Model type and solution approach |
| Model class
|
Mixed-Integer Quadratic Programming (MIQP)
|
| Sectors
|
Electricity plus sector couplings (industry, heat, transport, gas)
|
| Technologies
|
Renewables, Conventional Generation, CHP
|
| Decisions
|
dispatch
|
| Regions
|
ENTSO-E members
|
| Geographic Resolution
|
Individual power stations
|
| Time resolution
|
Hour
|
| Network coverage
|
transmission, distribution, AC load flow, DC load flow, net transfer capacities
|
|
| Model type
|
Optimization, Simulation, Other
|
|
|
|
| Variables
|
100000000
|
| Computation time
|
1500 minutes (backcasting 2018 with detailed hydro, CHP, DSR and FBMC model in hourly resolution with all ENTSO-E bidding zones)
|
| Objective
|
Economic welfare at electricity spot, electricity reserve, and emission markets in Europe
|
| Uncertainty modeling
|
|
| Suited for many scenarios / monte-carlo
|
No
|
|
References
Scientific references
Ketov, Mihail (2019). "Marktsimulationen unter Berücksichtigung der Strom-Wärme-Sektorenkopplung", Print Production, Aachener Beiträge zur Energieversorgung, volume 189, PhD thesis, RWTH Aachen University.
◀ back to model list